Long Lead
Long-form journalism platform for Long Lead, built with Decimal Studios to support original reported stories, editorial publishing, and performance optimization.
Long Lead needed a site that respected long-form storytelling while staying fast enough to keep readers engaged through dense editorial pieces.
We handled the technical side of the platform, covering frontend and backend development, ongoing support, and performance work that improved the reading experience.
Project overview
Long Lead publishes deep, reported stories, so performance matters as much as layout. The platform had to respect long form reading without becoming slow or fragile for editors.
Long Lead needed a website and digital experience that made the work easier to understand and easier to use. Long Lead needed a site that respected long-form storytelling while staying fast enough to keep readers engaged through dense editorial pieces.
Website and user experience
The live website, longlead.com, is where the work becomes useful to real visitors. We organized the experience around the main actions people need to take once they arrive.
- Narrative layouts built for long form journalism
- Editorial publishing workflows for a lean newsroom team
- Performance improvements for media heavy features
- Responsive article pages that keep reading comfortable on mobile
Technology and integrations
The implementation combined design, content structure, and the technologies the project actually depended on.
- Frontend engineering for long form storytelling
- Backend development and CMS support
- Performance optimization for editorial pages
- Ongoing maintenance with Decimal Studios
What we built
On the delivery side, this work covered both the public website and the product details behind it. We handled the technical side of the platform, covering frontend and backend development, ongoing support, and performance work that improved the reading experience.
More Projects
El Observador
2026WordPress development for El Observador, a Costa Rican digital news publication.
IrmaWP
2026Branding, UX/UI, website, and application development for IrmaWP, a workspace for managing WordPress sites with AI assistance.
OkFlow
2026Brand, website, and application development for OkFlow, connecting visual feedback with tasks and delivery planning.
